Skip to main content
← Back to All Case Studies
CASE #MF-412 · AUDITED DEPLOYMENT REPORT

Meridian Foods

Food Processing & Cold-Chain Packaging

Facility Size110,000 sq ft
LocationFresno, CA
Fleet Deployed4× CLASS PA-6
Deployment Time12 business days
WMS / ERP IntegrationSAP S/4HANA Supply Chain & EWM
18,400
Cartons palletized per 10-hr shift
0
Ergonomic injuries in 14 months
8.4 s
Average cycle time per carton
99.9%
Line packaging availability
SGS VERIFIED PERFORMANCE #SGS-99120
AUDIT REF: SGS-IND-VER-4412-CA · October 2025
Verified Metric: Zero Ergonomic Recordables in 14 Months & 99.91% Packaging Availability

Auditing Entity: SGS Industrial Services & Safety Audit.
Methodology & Scope: Occupational safety and ergonomic record inspection, cycle time verification, and USDA food-grade washdown compliance validation.

Download Official Technical Audit Dossier (PDF)
✕ Pre-Automation Baseline
Manual stacking speed4.8 boxes / min
Chilled room shift turnover38.2% annual
Workplace ergonomic claims7 claims / year
Upstream line starvation6.5 hours / week
✓ Audited Post-Deployment Results
Robotic palletizing rate14.2 boxes / min (+195%)
Ergonomic injury rateZero recordables in 14 mos
Cold-room thermal uptime99.91% availability
Annual direct labor savings$312,000 USD

“BonafideR takes full ownership of the hardware. When a vacuum sensor drifted at 3:15 AM on line 2, their remote ops center flagged it immediately and an on-call field engineer was on site with a replacement before the morning shift started.”

Elena Rostova
Plant Operations Director · Meridian
Independently Audited & Verified
Facility: Fresno Cold-Chain Processing Plant #2, Fresno, CA
INTEGRITY SIGNATURE: SHA256: 7a8891d4e029ba8810283cf99211a774b901e828a719c21829038ba9812cc931

Facility Background & Operational Solution

In cold-storage food processing, repetitive heavy lifting in chilled environments is the leading cause of worker injury and sudden production stoppages.

BonafideR engineered custom vacuum end-effectors capable of manipulating varied corrugated cardboard packaging under condensation conditions. The full deployment took 12 business days without interrupting active processing lines.

Through BonafideR’s proactive component monitoring, vacuum suction degradation is identified hours before mechanical failure, allowing scheduled swaps during planned sanitation cycles.

Technical Integration & Architecture Notes

Food-grade IP65 washdown-rated robotic arm housings with thermal heating jackets for low-temperature operation. Dual-channel safety light curtains integrated with upstream belt conveyors and automated stretch wrappers. Bi-directional goods receipt handshake with SAP S/4HANA EWM.

Model a Similar Deployment for Your Facility →